Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Friday, October 30, 2015

Probably spent 6 hours today working on my garage to remove old and decrepit shelves and junk and start installing new shelves that will hold both wings and fuselage parts.

The start of the installation of the new shelving.  Hoping to finish it tomorrow.  I designed it to be insanely strong to hold both wings (bottom two shelves) and all the fuselage parts.

Meanwhile I ordered a pneumatic nibbler (Neiko 30067A) to fix the fuel tank skin (and anything else that comes up that requires sheet metal cutting).  Looked at the other tank skin and it looks OK.


NEXT SESSION:
  1. Finish the shelving!
  2. Take the tank off the right wing and do the sealing procedure (after cleaning the inside with MEK).  There's also one last forming hole that needs a sealed rivet installed (will do both tanks).

No comments:

Post a Comment