Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Saturday, December 21, 2019

End of week update from Sling Central:

Cowling and engine work is complete. We are on wiring from here on. Began installation of the XRC connectors on the subpanel. Trimming wires to length and locating their final routing. Making sure wires clear all moving rigging like rudder cables and throttle/brake linkage and cables. Testing functionality of buttons and switches to be sure they work before final assembly and testing. Tested pilot and copilot stick function. Began routing pitot static lines. Began making pigtails from Garmin and other connectors on the panel to the XRC connectors.








No comments:

Post a Comment