Home
Build Time
Task List
Factory Photos
Exterior Fuselage
Exterior Wings
Engine
Interior Rear Fuselage
Interior Center Fuselage
Panel
Other Stuff
Fuselage Order of Build
Suppliers
Tightening & Torquing
Sling 4 W&B
Panel Planning Page
Avionics & Electrical
Firewall Forward
Blind Rivet Head Filling
Paint Schemes
Painting
Sling 4 Gallery
Misc. Thoughts
Tips-n-Hints
Tool List
Education
Links
Contact Us
Craig's Sling 4 Build Log
Categories
ailerons
(16)
avionics
(141)
electrical
(180)
elevator
(23)
Empennage
(55)
firewall forward
(222)
flaps
(12)
fuel cells
(68)
fuselage
(596)
horizontal stabilizer
(14)
instructions
(3)
interior
(104)
paint
(36)
Painting Planes
(3)
panel
(67)
propeller
(3)
rudder
(16)
seats
(5)
ServiceBulletin
(1)
shop
(33)
Sling Central
(23)
tools
(41)
vertical stabilizer
(20)
video
(37)
welcome
(22)
wheels
(44)
wings
(147)
Tuesday, February 18, 2020
Got some pics today from
Sling Central
.
The current thinking is that the plane will be flight ready within 4 weeks, so I'm looking into flights to go down then to meet with the DAR. Not booking though until we're closer.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment