2 hrs. working on the fuel cap and drain fittings. Also a second fit of the right tank back plate to the main spar.
Traveling for work for the next 3 days, so I'll be back at it on Friday.
The locking fuel cap doesn't fit in the parts as they come...
Time to grind them down. Here I have both the left and right upper parts to grind them together.
Used my Dremel with a mini ScotchBrite wheel.
The lower (inner) ring part needed a lot of grinding...
Voila! Perfect!
And on the tank.
Test fit of the back plate with the bolts into the nutplates. All lined up!
No comments:
Post a Comment