Sunday, February 7, 2016

2 hrs. re-cutting, re-flaring and reconnecting the pitot air line connectors.

Using the tube cutter I re-cut the tubes.  I then carefully filed down and deburred the new ends.

Setting up the flaring tool.

And reconnected!  I think this time it's good!

NEXT TASKS:
  1. Fitting and final sealing of left wing fuel tank.  Tank off and test for seal.
  2. Mark bolts.
  3. Fuel tank on.  Just bolted at this point.
  4. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming.  Fill rivets with Bondo.
  5. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  6. Rivet fuel tank on.  Fill rivets with Bondo.
  7. Wing tip assembly and light installation.
  8. Finish sanding of left wing bottom rivet heads.
  9. Finish right wing (3,4,5,6,7).
  10. Finally finish one of the composite tips of the elevator.
  11. Fill rivets of elevator with Bondo.
  12. START ON FUSELAGE!