2 hrs. last night riveting the backplate for the left tank.  Now I leave it on the wing for two more days.


NEXT TASKS:
  1. Remove plastic and deburr fuselage parts while the tank is setting.
  2. Monday tank off and test for seal. After the tank is off I want to get the wing off the 2x4's I put under the jigs that I had put there for extra clearance for the pitot.  I want to make sure the jigs are perfectly level with each other before any more riveting.
  3. Mark bolts.
  4. Fuel tank on.  Just bolted at this point.
  5. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming.  Fill rivets with Bondo.
  6. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  7. Rivet fuel tank on.  Fill rivets with Bondo.
  8. Wing tip assembly and light installation.
  9. Finish sanding of left wing bottom rivet heads.
  10. Finish right wing (4,5,6,7, 8).
  11. Finally finish one of the composite tips of the elevator.
  12. Fill rivets of elevator with Bondo.
  13. START ON FUSELAGE!