NEXT TASKS:
- Remove plastic and deburr fuselage parts while the tank is setting.
- Monday tank off and test for seal. After the tank is off I want to get the wing off the 2x4's I put under the jigs that I had put there for extra clearance for the pitot. I want to make sure the jigs are perfectly level with each other before any more riveting.
- Mark bolts.
- Fuel tank on. Just bolted at this point.
- Top skins riveted on (STRINGERS!). Top skins of left wing need priming. Fill rivets with Bondo.
- Leading edge riveted on (STRINGER!). Fill rivets with Bondo.
- Rivet fuel tank on. Fill rivets with Bondo.
- Wing tip assembly and light installation.
- Finish sanding of left wing bottom rivet heads.
- Finish right wing (4,5,6,7, 8).
- Finally finish one of the composite tips of the elevator.
- Fill rivets of elevator with Bondo.
- START ON FUSELAGE!