Riveting the sides.
On to it's side with the wife's help. ;-)
All of the bottom and sides are done!
NEXT TASKS:
- Rudder cables and supporting structure is next.
- Rivet the one on the left wing's step rib that needs special handling.?? (to be done in "spare" time).
No comments:
Post a Comment