Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Sunday, November 25, 2018

1.5 hr moving the grounding block and sanding some rivet heads.

I decided to move the grounding block from the firewall to the sub-panel rib.  It'll just be way easier to plug the grounds into it in this location.  I also like that it's right next to the VPX box.
From here I'll run a thick wire (gauge is TBD) to a grounding bolt on the firewall.  Here I've drilled out the main bolt hole and added the rivnut for the center hole in the block.

Done.

No comments:

Post a Comment