Monday, January 18, 2016

1 hr. prepping the back channel parts of the left fuel tank for sealing.  Sealing tomorrow...

Making sure all the contacting surfaces are scuffed up with Scotchbrite and cleaned with MEK.

NEXT TASKS:
  1. Fitting and final sealing of left wing fuel tank.  Tank off and test for seal.
  2. Mark bolts.
  3. Fuel tank on.  Just bolted at this point.
  4. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming.  Fill rivets with Bondo.
  5. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  6. Rivet fuel tank on.  Fill rivets with Bondo.
  7. Wing tip assembly and light installation.
  8. Finish sanding of left wing bottom rivet heads.
  9. Finish right wing (3,4,5,6,7).
  10. Finally finish one of the composite tips of the elevator.
  11. Fill rivets of elevator with Bondo.
  12. START ON FUSELAGE!