2 hrs. doing the electrical wiring of the pitot heat.

A picture of the pitot with the screws installed.

Had to enlarge the forming hole in the 1st rib in order to install a grommet and pass the pitot heat wire harness through it.  Didn't finish the wiring install today, but will tomorrow.

NEXT TASKS:
  1. Finish installing pitot electrical lines and connect to pitot.
  2. Cleco leading edge back on. I'll also test fit the fuel tank.
  3. Fitting and final sealing of left wing fuel tank.  Tank off and test for seal.
  4. Fuel tank on.  Just bolted at this point.
  5. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming.  Fill rivets with Bondo.
  6. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  7. Rivet fuel tank on.  Fill rivets with Bondo.
  8. Wing tip assembly and light installation.
  9. Finish sanding of left wing bottom rivet heads.
  10. Finish right wing (5, 6,7,8,9).
  11. Finally finish one of the composite tips of the elevator.
  12. Fill rivets of elevator with Bondo.
  13. START ON FUSELAGE!