I still have to sand them but I think that will be fast (I'll use the masking tool for that too).
NEXT TASKS:
- Wing tip assembly and light installation.
- Test fit of aileron and flap, with likely adjustment of the aileron to line up the trailing edges.
- Fill rivets - Half done already.
- Rivet the one on the left wing's step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
- Finish one of the composite tips of the elevator.
- Fill rivets of elevator.
- START ON FUSELAGE!
No comments:
Post a Comment