2 hrs. sanding elevator rivets and starting on prep'ing fuselage parts.

Other side done, flipped it over to do the other side (and the tips).  Will do that in-between fuselage work.

Rear Fuselage Ribs 9, 8, 7, 6, 5, 4 and 3 ready for deburring, cleaning and priming.

NEXT TASKS:
  1. Fill bottom rivets of elevator and fillet the composite tips of it to the skin (to be done in "spare" time).
  2. Rivet the one on the left wing's step rib that needs special handling.?? (to be done in "spare" time).
  3. Prep rear fuselage ribs 9, 8, 7, 6, 5, 4, and 3.
  4. Start assembly of those sub-assemblies.