Home
Build Time
Task List
Factory Photos
Exterior Fuselage
Exterior Wings
Engine
Interior Rear Fuselage
Interior Center Fuselage
Panel
Other Stuff
Fuselage Order of Build
Suppliers
Tightening & Torquing
Sling 4 W&B
Panel Planning Page
Avionics & Electrical
Firewall Forward
Blind Rivet Head Filling
Paint Schemes
Painting
Sling 4 Gallery
Misc. Thoughts
Tips-n-Hints
Tool List
Education
Links
Contact Us
Craig's Sling 4 Build Log
Categories
ailerons
(16)
avionics
(141)
electrical
(180)
elevator
(23)
Empennage
(55)
firewall forward
(222)
flaps
(12)
fuel cells
(68)
fuselage
(596)
horizontal stabilizer
(14)
instructions
(3)
interior
(104)
paint
(36)
Painting Planes
(3)
panel
(67)
propeller
(3)
rudder
(16)
seats
(5)
ServiceBulletin
(1)
shop
(33)
Sling Central
(23)
tools
(41)
vertical stabilizer
(20)
video
(37)
welcome
(22)
wheels
(44)
wings
(147)
Monday, April 9, 2018
1 hr. doing some more soundproofing.
I've been advised to not rivet the outer seat rails at all until the wings are on, so I will follow that advice. The inner rails and center console are OK to rivet now though.
Did a few more of the easy sections of soundproofing on both sides.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment