Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Sunday, April 1, 2018

3 hrs. on reinforcing the front top rib and starting to put in the NACA ducts.

Saw that Peter Calley put in these 1" angles to reinforce the front top rib and I thought that was a good idea, so I did the same.

Pilot holes drilled and cleco'ed.

All drilled and reamed.

Both sides drilled and reamed.  I have the Sikaflex adhesive/sealant, so tomorrow I should be able to install these parts.  Then I think I'll start applying the soundproofing to the insides of the side skins.

No comments:

Post a Comment