3 hrs. on reinforcing the front top rib and starting to put in the NACA ducts.
Saw that Peter Calley put in these 1" angles to reinforce the front top rib and I thought that was a good idea, so I did the same.
Pilot holes drilled and cleco'ed.
All drilled and reamed.
Both sides drilled and reamed. I have the Sikaflex adhesive/sealant, so tomorrow I should be able to install these parts. Then I think I'll start applying the soundproofing to the insides of the side skins.
No comments:
Post a Comment