Sunday, April 28, 2019

4 hrs. on the firewall.  Thanks Kerry for helping out!

Enlarged these 2 holes and the 3 on the other side for the Cable Safe bulkhead pass-throughs.

Picking the right size ring terminal for the shunt.

Making the copper bus bar (1/2" x 1/16") between the starter and master relays.

Used some red heat shrink and that's done.

Made another bus bar between the shunt and the ANL fuse holder.

Nothing is tied down yet, but it's starting to come together!

The line to the VPX from the shunt.