Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Friday, May 26, 2017

1 hr. installing the ELT.

All 10 holes drilled out, reamed and deburred to 4mm.

Traced around the tray to remove the soundproofing.  A bit tedious to remove that material since it's very strongly bonded to the skin.

In place and ready for drilling through.

First two cleco'ed so the rest are easy.

Lots of aluminum debris when you drill and ream!  Cleaned it up with duct tape.

Don't forget to put the strap in place before riveting!

Was able to rivet one side.  The other side is inaccessible right now because of the bench.  I'll rivet those later.

And it's in!  Nice and solid.

No comments:

Post a Comment