1.5 hrs. finishing up the pitch servo wiring.
Add some more heat shrink tubing to the graft of the trim motor wiring.
Here's the split with panel wires going forward and the motor control crossing the fuselage to the pitch servo.
Over and pinned (I'm holding the CAN Bus wires done the other day).
Let's not forget the required Pitch Strap wires for the pitch servo...
Jumpered.
Putting on some heat shrink and loom (is that the right word?) for the wires going to the panel.
Now it all comes together...
Tight, but it fits!
Shell on and ready to go.
Very tight squeeze getting the connector in there and tightened down.
Added some tie wraps and it's looking good! On to the roll servo...
No comments:
Post a Comment