1.5 hrs. on wire routing.
These are useful tie-downs that I've used in a few places. One 3.2mm rivet holds it in place.
I think I have the routing through here figured out. Took out some of the loom - in particular through the main spar area. Left side still has some loom.
Close-up from behind through main spar area.
View from front looking back.
Looking nice and neat! The wire ties holding the upper wires are temporary.
Keeping it neat until I'm ready to connect everything up.
This is the rivet holding the wire tie of the type in the first photo.
Close-up from the front under the main spar.
No comments:
Post a Comment