Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Thursday, March 17, 2016

1 hr. riveting the 3 rivets on the bottom and taping the top skins and leading edges for Bondo filling.

Had to use a hand riveter to get the two near the pitot.  Hard to pull!!  The 3rd rivet on the bottom was done by shortening the rivet (there was a rib not far under the skin).

Taped up all the rivets and started to sand the tops off.

Using course sandpaper the tops come right off.

NEXT TASKS:
  1. Rivet the one on the step rib that needs special handling.
  2. Sand off the top of the rivets and fill rivets with Bondo.
  3. Install landing lights.
  4. End rib installed (Jig needs to come off).
  5. Wing tip assembly riveted on and light installation.
  6. Composite filler for join between wing tip and skins. Perhaps other seams can use some filler?
  7. Put the aileron and flap on the wing to check for straightness of the trailing edge (Thanks Peter, I saw that on your blog! ;-)). Based on what I'm reading online it seems likely that I'll need to re-rivet some of the aileron/flaps to line up the trailing edges...  Wish I knew this before I had riveted them...
  8. Finish sanding of left wing bottom rivet heads.
  9. Finish right wing.
  10. Finally finish one of the composite tips of the elevator.
  11. Fill rivets of elevator with Bondo.
  12. START ON FUSELAGE!

No comments:

Post a Comment