Sunday, March 20, 2016

3 hrs. installing the landing lights.

The brackets had to be enlarged for my lights.

Using a grinding bit on the Dremel was better than using a nibbler.

Done.

Since the brackets float I had to temporarily tape them to hold them together while screwing them in.

The outer bolts in first.  The order of parts from the outside: bolt, front plate, light, back plate, spring and then into the rivnut.

And they're in!

And they work!  :-)

NEXT TASKS:
  1. Finish the bottom rivet filling (will try without flipping).
  2. Rivet the one on the step rib that needs special handling.
  3. End rib installed (Jig needs to come off).
  4. Wing tip assembly riveted on and light installation.
  5. Composite filler for join between wing tip and skins. Perhaps other seams can use some filler?
  6. Put the aileron and flap on the wing to check for straightness of the trailing edge (Thanks Peter, I saw that on your blog! ;-)). Based on what I'm reading online it seems likely that I'll need to re-rivet some of the aileron/flaps to line up the trailing edges...  Wish I knew this before I had riveted them...
  7. Finish right wing.
  8. Finally finish one of the composite tips of the elevator.
  9. Fill rivets of elevator with Bondo.
  10. START ON FUSELAGE!