Sunday, March 6, 2016

2 hr's prepping fuselage parts while I wait for the leak sealant to set.  I was going to test it today but the sealant is still tacky and I really want it set before testing it.

One of the more interestingly shaped parts of the fuselage.

Some random parts ready to have their plastic peeled and deburred.  I will hold off on cleaning and priming until I'm ready to use those parts.

NEXT TASKS:
  1. Retest right tank on Monday.
  2. Mark all wing bolts.
  3. Fuel tank on.  Just loosely bolted at this point.
  4. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming first.  Fill rivets with Bondo.
  5. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  6. Rivet fuel tank on.  Fill rivets with Bondo.
  7. Install landing lights.
  8. Wing tip assembly and light installation.
  9. Finish sanding of left wing bottom rivet heads.
  10. Finish right wing (3,4,5,6,7,8).
  11. Finally finish one of the composite tips of the elevator.
  12. Fill rivets of elevator with Bondo.
  13. START ON FUSELAGE!