Had friends over to help with riveting the wing.
David the Riveter... ;-)
Almost done....
Top all done! Just have to do the riveting of the bottom of the leading edge and fuel tank and it's done...
NEXT TASKS:
- Rivet the bottoms of the leading edge and fuel tank.
- Fill rivets with Bondo.
- Install landing lights.
- End rib installed (Jig needs to come off).
- Wing tip assembly riveted on and light installation.
- Composite filler for join between wing tip and skins. Perhaps other seams can use some filler?
- Put the aileron and flap on the wing to check for straightness of the trailing edge (Thanks Peter, I saw that on your blog! ;-)).
- Finish sanding of left wing bottom rivet heads.
- Finish right wing.
- Finally finish one of the composite tips of the elevator.
- Fill rivets of elevator with Bondo.
- START ON FUSELAGE!
No comments:
Post a Comment