Saturday, March 5, 2016

Exactly 1 hr. to pull the plastic, deburr, clean and prime the right wing top skins (including the setup and cleaning of the sprayer).


NEXT TASKS:
  1. Remove plastic and deburr fuselage parts while the tank is being tested (and any other spare time I have).
  2. Retest right tank on Sunday.
  3. Mark all wing bolts.
  4. Fuel tank on.  Just loosely bolted at this point.
  5. Top skins riveted on (STRINGERS!).  Top skins of left wing need priming first.  Fill rivets with Bondo.
  6. Leading edge riveted on (STRINGER!).  Fill rivets with Bondo.
  7. Rivet fuel tank on.  Fill rivets with Bondo.
  8. Install landing lights.
  9. Wing tip assembly and light installation.
  10. Finish sanding of left wing bottom rivet heads.
  11. Finish right wing (4,5,6,7,8,9,10).
  12. Finally finish one of the composite tips of the elevator.
  13. Fill rivets of elevator with Bondo.
  14. START ON FUSELAGE!