Sanded with progressively finer sandpaper (60, 120, 220). It feels way better than it looks in the photo. It's nicely shaped and smooth. I declare it done!
View from the trailing edge.
NEXT TASKS:
- Rivet the one on the step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
- Finish right wing.
- Finally finish one of the composite tips of the elevator.
- Fill rivets of elevator with Bondo (actually I may switch to using epoxy filler since that takes much longer to harden, so I don't have to keep making small batches of Bondo).
- START ON FUSELAGE!
No comments:
Post a Comment