Wednesday, April 27, 2016

1.5 hrs. finishing the top rivets on the right wing.

Me and my wing. ;-)

NEXT TASKS:
  1. Leading edge and fuel tank riveted on
  2. Wing tip assembly and light installation.
  3. Test fit of aileron and flap, with likely adjustment of the aileron to line up the trailing edges.
  4. Fill rivets (use filler this time and try the factory recommended method of filling the rivets).
  5. Rivet the one on the left wing's step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
  6. Finish one of the composite tips of the elevator.
  7. Fill rivets of elevator.
  8. START ON FUSELAGE!