Saturday, April 23, 2016

2 hrs. finishing the cleco'ing, reaming out holes that needed it (more than the left wing..) and putting in the rivets.  Tomorrow is the start of the actual riveting.

A sea of cleco's and rivets!

Close up.

NEXT TASKS:
  1. Top skins riveted on.
  2. Leading edge riveted on
  3. Fuel tank riveted on.
  4. Fill rivets (use filler this time and try the factory recommended method of filling the rivets).
  5. Wing tip assembly and light installation.
  6. Rivet the one on the left wing's step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
  7. Finish one of the composite tips of the elevator.
  8. Fill rivets of elevator.
  9. START ON FUSELAGE!