3 hrs. starting to rivet the top skins of the right wing.

Much of it done.

Time-lapse of some of the time.  My wife and some friends help out.


NEXT TASKS:
  1. Top skins riveted on.
  2. Leading edge riveted on
  3. Fuel tank riveted on.
  4. Fill rivets (use filler this time and try the factory recommended method of filling the rivets).
  5. Wing tip assembly and light installation.
  6. Rivet the one on the left wing's step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
  7. Finish one of the composite tips of the elevator.
  8. Fill rivets of elevator.
  9. START ON FUSELAGE!

1 comment:

  1. Love the time lapse video! I wish I had done some of that when I was building.