2 hrs. testing the wiring one last time and cleco'ing the skins on.

Decided to use the wicking Loctite on the tank bolts just for good measure.

All the tip light wiring works.

Landing/Taxi lights wiring works.

Nearly done cleco'ing all of the top skins.

Here's me with my very cool 2014 Oshkosh t-shirt.  ;-)

NEXT TASKS:
  1. Top skins riveted on.
  2. Leading edge riveted on
  3. Fuel tank riveted on.
  4. Fill rivets (use filler this time and try the factory recommended method of filling the rivets).
  5. Wing tip assembly and light installation.
  6. Rivet the one on the left wing's step rib that needs special handling (waiting to hear back from the factory on what to do with that hole).
  7. Finish one of the composite tips of the elevator.
  8. Fill rivets of elevator.
  9. START ON FUSELAGE!