1 hr. putting a wrap around the stick wires and extending the flap wires to the panel.
Wrapped the stick wires in a protective nylon sheath.
The wire for the flap motor is not long enough to reach the panel, so time to extend it.
Using a 3-wire #22 and a 2-wire #22 to do the job. Here they're striped and have the shrink wrap tubing on, so it's ready to shrink once the wires are soldered.
I use a lineman's splice to connect the wires. Here they're already soldered.
The shrink wrap for the individual wires are done.
And the outer shrink wrap is done! Now it reaches to the panel (with enough spare length).
No comments:
Post a Comment