Subcribe to our RSS feeds Join Us on Facebook Follow us on Twitter Add to Circles

Categories

Wednesday, May 23, 2018

1 hr. last night starting to fabricate the brackets for the hanging boxes.

The shape of the brackets to hold the front of the ADS-B box.  I know I could make a simpler one that would connect to the bottom of the sub-panel flange, but since the box is fairly heavy I felt better with it being on top of the flange.

Ready to cut.

Cut and shaped...

And this is how it will attach.

With the box in place.  Need to drill the holes and insert rivnuts.

Both sides cut and shaped.

This side of the box has a cooling vent, so I need to consider that...

...So I cut that out of the bracket on that side.

No comments:

Post a Comment