Riveting in the sub-panel.  The two rivets in the center here were 3.2mm, but the holes got enlarged a bit when I drilled them out, so I upsized them to 4mm.

Doing a test fit of the front top skin.  Strategic cleco'ing was called for...  Trying to cleco the skin to the sub-panel from the side skin up was not going to work because it was too far off.  Starting in the middle down toward the side skin worked much better.

Cleco'ing the front of the top skin will also require some strategic cleco'ing.... Has to get through 4 layers of metal... :-O

Looking good.