1 hr. on spats and other misc. items.
Covering the backside so I can fill some holes.
My epoxy mix.
Mixing in the filler.
...and filling the holes. Let those harden overnight.
I do believe this goes here.
Cut through the soundproofing for two holes. Upper right for the flap torque tube and I think the lower left one is for the fuel line (?).
Time to cut the hole for the OAT. The hole needs to be 5/16" by my measurement.
This looks good... Not too close to the side so I'll have room to insert it and hold the nut.
And we have a 5/16" hole ready to go.
Got my order of plastic washers. This should cover most (all?) cases of use.
No comments:
Post a Comment