2 hrs. on the firewall.
Making the shunt sense lines. This fits just right.
Both connected (put Deoxit on the screws)...
Figuring out where to put the grommet and shield for the fuel pump wires. This looks about right.
Cut out in the heat shield done...
With the engine mount in the way it takes some special drill bits to get in there...
One rivnut in it's time to properly locate the other holes.
Two rivnuts in and started the hole for the grommet.
All done!
Getting there!
No comments:
Post a Comment